FAQs

Tooling & Production

What is the typical lead time for injection mold tooling?
Depending on the complexity and size of the mold, our standard lead time is 4 weeks. For rapid prototyping, we can often deliver T1 samples within 3 days.
Do you handle low-volume production?
Absolutely. We support low-volume projects starting from 100 units up to mass production of 500K units.

Quality & Engineering

What precision/tolerance can you achieve?
We maintain tight tolerances as high as +/- 0.01 mm using advanced CNC and EDM equipment. Full measurement reports are provided with every T1 sample.
Do you provide DFM analysis?
Yes, we provide a comprehensive Design for Manufacturing (DFM) analysis for every project to identify potential sink marks, warpage, or gating issues before tooling begins.

Materials & IP

What plastics do you support?
We work with a vast range of materials including ABS, PC, PA6/66, TPU, and high-performance resins like PEEK.
How is my IP (Intellectual Property) protected?
We sign NDAs before receiving any drawings. Our internal data protocols ensure your designs are handled with strict confidentiality.

Could not find the answer you were looking for?

Still have questions? Contact our engineers